Some checks failed
CI / lint-and-test (push) Has been cancelled
Sinus inflow: 54-270 m³/h (base 0.015 + amplitude 0.06 m³/s), 4 min period. Peak needs 1-2 pumps, never all 3 = realistic headroom. PS control: continuous proportional demand when level > stopLevel, not just when > startLevel && filling. Pumps now ramp down smoothly as basin drains toward stopLevel instead of staying stuck at last setpoint. pumpingStation e8dd657: dead zone elimination build_flow.py: sinus tuned for gradual pump scaling visibility Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
91 KiB
91 KiB