- Update all submodule URLs from gitea.centraal.wbd-rd.nl to gitea.wbd-rd.nl - Add settler as proper submodule in .gitmodules - Add agent skills, function anchors, decisions, and improvements - Add Docker configuration and scripts - Add manuals and third_party docs - Update .gitignore with secrets and build artifacts - Remove stale .tgz build artifact Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
55 lines
2.1 KiB
Markdown
55 lines
2.1 KiB
Markdown
---
|
|
name: evolv-ot-edge-plc-integration
|
|
description: Engineer OT edge connectivity and PLC interoperability for EVOLV. Use when implementing or reviewing OPC UA/Modbus and similar integrations, namespace/tag mapping, quality/timestamp semantics, retry/reconnect behavior, and deterministic command/feedback contracts at the edge.
|
|
---
|
|
|
|
# EVOLV OT Edge PLC Integration
|
|
|
|
## Mission
|
|
Deliver reliable, deterministic edge protocol integration between EVOLV Node-RED nodes and PLC/SCADA systems.
|
|
|
|
## Harness Execution Contract
|
|
- Start from current integration topology, topic contracts, and protocol endpoints.
|
|
- Define invariants before edits:
|
|
- command/feedback contracts remain deterministic
|
|
- reconnect/retry behavior is bounded and observable
|
|
- quality/timestamp semantics are preserved end-to-end
|
|
- Validate with connection-loss and recovery evidence.
|
|
|
|
## Scope
|
|
- Edge/connector nodes (existing and new)
|
|
- Topic mapping code in `nodes/*/src/`
|
|
- Admin endpoints/config for connector behavior and credentials
|
|
|
|
## Workflow
|
|
1. Map PLC tags/NodeIds/registers to EVOLV message contracts.
|
|
2. Define write acknowledgement and feedback confirmation rules.
|
|
3. Implement reconnect/backoff/session handling.
|
|
4. Enforce quality, timestamp, and stale-value semantics.
|
|
5. Verify failover behavior and command idempotency.
|
|
|
|
## Standards
|
|
- Never assume connection continuity; model transient faults explicitly.
|
|
- Keep protocol mappings versioned and auditable.
|
|
- Separate transport errors from process-state errors.
|
|
- Ensure secure defaults align with OT/IT security skill.
|
|
|
|
## Test Expectations
|
|
Cover:
|
|
- disconnect/reconnect and session re-establish paths
|
|
- duplicate/late/out-of-order message handling
|
|
- read/write mapping correctness and unit conversion
|
|
- safe behavior under degraded quality or timeout
|
|
|
|
## Deliverables
|
|
Return:
|
|
- integration contract map (protocol <-> topic/payload)
|
|
- retry/recovery strategy and limits
|
|
- changed files/tests with failure-injection evidence
|
|
- operational rollout risks and mitigations
|
|
|
|
Decision interview triggers:
|
|
- command authority or handshake behavior changes
|
|
- protocol mapping breaks requiring migration
|
|
- timeout/retry strategy changes affecting availability/safety
|